3. CRITICAL: 360° Slew Test (Unladen) for stability.
4. Rigger attaches 1-leg web sling & shackle.
5. Set Boom to 26.9m (or required length). Brief Operator.
6. TRIAL LIFT: Hoist just off ground. Check tension.
7. Execute Lift: Hoist, Derrick, Slew to position.
8. Land Load. De-rig crane & accessories.
Permit Sign-Off
Verification
By signing below, you confirm that ground bearing capacity (50.2 tm²) exceeds the worst-case
outrigger load (25.2 tm²) and all personnel are briefed.